Monday 23 January 2017

Llanedeyrn Progress Update

The steel frame went up at the Powerhouse Hub extension just before Christmas. Now the ground floor slab is being poured on a deep layer of thermal insulation and a Radon barrier. Further Radon protection measures involve the placement of a couple of sump boxes, connected to underground drainage pipes. If Radon is measured above a critical level at the completion of the project then an extract fan can be installed on the end of the pipework to draw out the gas from below the slab.

No comments:

Post a Comment